| 1 | Define the product specification | Write down materials, dimensions, tolerances, performance requirements, packaging, and intended use before requesting quotations. | A dated specification sheet, drawings, reference samples, and agreed inspection criteria. | Suppliers quote against different assumptions or leave key requirements unspecified. | Send the same specification to each shortlisted supplier and ask them to identify any exceptions. |
| 2 | Verify the supplier’s legal identity | Confirm the registered entity, business address, operating status, and the name of the party that will sign the contract. | Business registration records where available, matching company details on quotations and contracts, and a verifiable business address. | Inconsistent legal names, unexplained changes to payment accounts, or reluctance to provide basic registration details. | Check the relevant official registry and independently confirm contact and bank details before payment. |
| 3 | Assess production capability | Ask whether production is performed in-house or subcontracted, and review capacity, lead times, and experience with comparable products. | Facility or process information, production schedules, capacity statements, and a clear disclosure of subcontractors. | Unclear production location, unsupported capacity claims, or an inability to explain the manufacturing process. | Match the supplier’s demonstrated capability to your order volume and delivery schedule. |
| 4 | Request and evaluate a sample | Test a production-representative sample against the specification before approving a bulk order. | Written sample approval, test results where relevant, and a retained reference sample or documented sample record. | The sample differs from the proposed production process or changes are made without written approval. | Record accepted deviations and require written approval for any later specification change. |
| 5 | Agree on quality controls | Define inspection stages, test methods, acceptance criteria, and how defects or corrective actions will be handled. | A quality plan, inspection checklist, test reports where applicable, and agreed procedures for nonconforming goods. | Quality is described only as “standard” or “good” with no measurable acceptance criteria. | Put measurable requirements and inspection rights in the purchase agreement. |
| 6 | Check product and destination-market requirements | Identify applicable safety, labeling, testing, documentation, and import requirements for the product and destination market. | Current information from relevant regulators, qualified testing bodies, or a customs professional; confirm that documents apply to the specific product and market. | Certificates or test reports have unclear scope, expired dates, or do not identify the relevant product or standard. | Confirm requirements before production; obligations vary by product and destination. |
| 7 | Clarify the customs classification and landed cost | Research the likely HS classification and estimate freight, insurance, duties, taxes, brokerage, and other destination charges. | A documented classification review and a cost estimate based on the importing country’s current tariff and tax rules. | A quote presents only the unit price or assumes a duty rate without checking the destination market. | Ask a customs broker or relevant authority to confirm classification where the consequences of error are significant. |
| 8 | Specify delivery terms and responsibilities | State the chosen Incoterms® rule, named place or port, and version in the contract or purchase order. | A clear reference, such as “FCA [named place], Incoterms® 2020,” with responsibilities for transport, export clearance, and import clearance understood by both parties. | Terms are written only as “FOB” or “door to door” without a named place or agreed rule details. | Use the current agreed Incoterms® rule and confirm that it suits the shipment and transport mode. |
| 9 | Use a controlled payment process | Agree on payment milestones, required documents, currency, and the process for verifying any change in bank instructions. | A signed contract, matching beneficiary details, and independently verified payment instructions. | Urgent requests to pay a new account, a beneficiary unrelated to the contracting entity, or pressure to bypass verification. | Confirm account changes through a previously verified contact channel before transferring funds. |
| 10 | Plan logistics and build a buffer | Confirm packaging, shipment dimensions and weight, transport mode, document requirements, and the timing of each production and transit stage. | A written production schedule, packing details, shipping documents list, and a delivery plan that accounts for customs clearance. | Delivery dates exclude production time, document preparation, or possible customs delays. | Track key milestones and allow contingency time for production, transport, and border procedures. |