| Butterfly valve design | API 609 | Confirm the offered valve’s design, face-to-face dimensions, pressure class, end connections, and applicable API 609 edition match the purchase specification. | Product datasheet, dimensional drawing, design-standard declaration, and nameplate or marking details. |
| Pressure and leakage testing | ISO 5208; applicable purchase specification | Check the specified test type, test pressure, duration, medium, and acceptance criteria. ISO 5208 covers pressure testing of metallic valves and defines leakage rates; the required rate should be stated in the order. | Sample or project-specific pressure-test report identifying the valve, test procedure, results, and acceptance criteria. |
| Pressure-temperature rating and construction | ASME B16.34, where specified and applicable | Verify the valve’s applicable pressure-temperature rating, material group, end connection, and design conditions against the project requirements. Do not assume the standard applies unless the valve is specified accordingly. | Rating information, material specifications, drawings, and a written statement identifying the applicable standard and edition. |
| Triple-offset design details | Project design specification and applicable valve standard | Review the offset geometry, disc-and-seat arrangement, sealing direction, operating torque, and suitability for the specified service and cycle requirements. | Cross-sectional drawing, design description, torque data, and service limitations. |
| Materials and traceability | Purchase specification and applicable material standards | Match body, disc, shaft, seat, and other pressure-retaining or wetted-part materials to the specified service. Confirm heat or batch traceability where required. | Bill of materials, material test certificates when required, and traceability records linked to the valve serial number or production lot. |
| Quality and inspection controls | Contract quality plan; applicable certification requirements | Assess whether inspection and test activities cover incoming materials, machining, assembly, final testing, nonconformities, and record retention. Check certificate scope and validity where certification is required. | Quality-system certificate, inspection and test plan, sample inspection records, and calibration records for relevant test equipment. |
| Actuation and interface | Project actuator and piping-interface requirements | Confirm actuator type, required operating torque, mounting interface, fail position if applicable, and compatibility with the control system and operating conditions. | Actuator sizing calculations, interface drawing, wiring or pneumatic diagram as applicable, and operating instructions. |
| Documentation and delivery scope | Purchase order and project documentation requirements | Agree the required document list, language, review schedule, preservation method, spare-parts scope, and delivery terms before order placement. | Document index, approved drawings, operation and maintenance manual, packing details, and delivery schedule. |