| 1 | Compact walk-behind combination unit | 450–550 mm (18–22 in) | 1,800–2,800 m²/h | 25–40 L | 10–20 L | Battery | Small shops, clinics, and narrow aisles | $4,000–$8,000 |
| 2 | Mid-size walk-behind combination unit | 600–700 mm (24–28 in) | 2,500–4,000 m²/h | 40–70 L | 20–35 L | Battery | Schools, supermarkets, and medium-sized facilities | $7,000–$14,000 |
| 3 | Heavy-duty walk-behind combination unit | 700–850 mm (28–33 in) | 3,000–5,000 m²/h | 70–100 L | 30–50 L | Battery | Large retail floors, workshops, and warehouses | $12,000–$22,000 |
| 4 | Compact ride-on combination unit | 700–850 mm (28–33 in) | 4,000–6,500 m²/h | 80–130 L | 35–60 L | Battery | Medium warehouses and indoor loading areas | $18,000–$32,000 |
| 5 | Mid-size ride-on combination unit | 900–1,100 mm (35–43 in) | 5,500–9,000 m²/h | 130–200 L | 60–100 L | Battery | Distribution centers, factories, and large stores | $28,000–$48,000 |
| 6 | Large ride-on combination unit | 1,100–1,300 mm (43–51 in) | 7,000–11,000 m²/h | 180–280 L | 90–150 L | Battery | Large industrial floors and logistics facilities | $40,000–$70,000 |
| 7 | Industrial ride-on unit with expanded sweeping system | 1,200–1,500 mm (47–59 in) | 8,000–13,000 m²/h | 200–350 L | 120–220 L | Battery or LPG, depending on configuration | Heavy-duty industrial sites and large production halls | $55,000–$95,000 |
| 8 | Outdoor-capable ride-on combination unit | 1,000–1,400 mm (39–55 in) | 6,500–12,000 m²/h | 150–300 L | 100–200 L | Battery or LPG, depending on configuration | Covered yards, rough-finished concrete, and mixed indoor-outdoor areas | $45,000–$90,000 |
| 9 | High-capacity industrial combination unit | 1,400–1,700 mm (55–67 in) | 10,000–16,000 m²/h | 300–450 L | 180–300 L | Battery or LPG, depending on configuration | Very large warehouses, transport hubs, and industrial campuses | $75,000–$130,000 |
| 10 | Municipal or large-site combination sweeper-scrubber | 1,600–2,000 mm (63–79 in) | 12,000–20,000 m²/h | 350–600 L | 250–500 L | Diesel, LPG, or battery, depending on configuration | Large campuses, terminals, and expansive hard-surface areas | $100,000–$200,000+ |