| 1 | Not disclosed | Confirm milling, turning, axis count, materials, and tolerances directly with the supplier. | Request current certificates and confirm their scope, site, and expiration dates. | Confirm destination countries, shipping terms, and export-control requirements. | Request a capability statement and sample inspection report. |
| 2 | Not disclosed | Confirm whether the supplier offers 3-axis or 5-axis machining and turning. | Check whether quality certificates apply to the production facility making the parts. | Ask for delivery coverage, transit estimates, and customs documentation support. | Verify machine availability and inspection equipment for the quoted job. |
| 3 | Not disclosed | Confirm supported metals, plastics, maximum part dimensions, and finishing options. | Request certificate numbers and the issuing certification body's details. | Confirm whether international shipments are handled directly or through a logistics partner. | Ask for material traceability and first-article inspection options. |
| 4 | Not disclosed | Confirm achievable tolerances for the specific material, geometry, and production volume. | Check whether any claimed industry certification covers the relevant process and site. | Confirm accepted currencies, payment terms, and import-document support. | Request a written tolerance review before placing an order. |
| 5 | Not disclosed | Confirm prototype, low-volume, and production-volume capacity separately. | Request evidence of the quality-management system applicable to the quoted work. | Check whether the supplier can meet the buyer's destination-specific packaging and labeling rules. | Compare quotes using the same drawings, material specification, and inspection requirements. |
| 6 | Not disclosed | Confirm whether secondary operations such as deburring, heat treatment, or surface finishing are available. | Verify certificate validity with the issuing body where required. | Ask about shipping insurance, tracking, and responsibility for duties and taxes. | Confirm which operations are performed in-house and which are subcontracted. |
| 7 | Not disclosed | Confirm design-for-manufacturing review and support for CAD drawing formats. | Ask for audit, nonconformance, and corrective-action procedures relevant to the project. | Confirm production location and expected lead time to the delivery address. | Request a documented production and quality-control plan. |
| 8 | Not disclosed | Confirm capacity for repeat orders, production scheduling, and revision control. | Check whether quality records can be supplied in the format required by the buyer. | Confirm communication coverage, time-zone overlap, and escalation contacts. | Agree on change control, record retention, and acceptance criteria before production. |
| 9 | Not disclosed | Confirm dimensional inspection methods and measurement capability for critical features. | Request calibration records for measuring equipment when required by the purchase specification. | Check applicable trade, customs, and product-compliance obligations for the shipment. | Specify required inspection reports and acceptance sampling in the purchase order. |
| 10 | Not disclosed | Confirm that the supplier can meet the full drawing, material, finish, and quantity requirements. | Treat certification claims as unverified until current documentation is reviewed. | Confirm shipping route, delivery terms, and the party responsible for customs clearance. | Run a sample order or supplier qualification review before committing to production. |