| 1 | Cryogenic pump package specialists | LNG transfer pumps, motors, base frames, instrumentation, and package testing. | Verify pump materials and seals are suitable for the specified cryogenic design conditions; review minimum-flow and abnormal-operation protections. | Pump curves, materials list, operating envelope, test procedures, and references for comparable LNG duties. |
| 2 | Marine LNG fuel-system integrators | Integrated bunkering skids connecting storage, transfer lines, metering, and ship-to-shore or ship-to-ship interfaces. | Check interface control, emergency shutdown (ESD) logic, communications, and transfer-sequence compatibility with the receiving vessel. | Interface register, control narratives, ESD cause-and-effect matrix, and system integration test plan. |
| 3 | Floating production and marine module fabricators | Skid structural design, equipment mounting, piping fabrication, lifting provisions, and vessel integration support. | Assess motion, vibration, fatigue, corrosion protection, hazardous-area requirements, and safe access for inspection and maintenance. | Structural calculations, weight and center-of-gravity data, lifting drawings, weld records, and inspection documentation. |
| 4 | Process-package engineering contractors | Engineering and assembly of pump skids with piping, valves, controls, and supporting utilities. | Review design pressure and temperature limits, relief and isolation philosophy, drainage, leak detection, and maintainability. | Process flow diagrams, piping and instrumentation diagrams, design-basis documents, and compliance matrix. |
| 5 | Metering and transfer-system package suppliers | Pump-skid integration with flow measurement, transfer monitoring, and operational data systems. | Confirm the measurement method is suitable for the specified LNG service and that operating procedures address start-up, shutdown, and line cooldown. | Meter sizing basis, uncertainty statement, calibration plan, data interface list, and acceptance-test criteria. |
| 6 | Electrical and instrumentation package builders | Motor control, local panels, field instruments, cabling, and package control integration. | Verify hazardous-area equipment suitability, electrical protection, grounding, alarm handling, and fail-safe responses. | Electrical load list, instrument index, hazardous-area documentation, functional test records, and software configuration controls. |
| 7 | Marine piping and cryogenic valve package suppliers | Cryogenic piping assemblies, valves, strainers, supports, and associated skid components. | Check low-temperature material suitability, valve isolation requirements, thermal contraction allowances, and inspection access. | Material traceability, pressure-test records, valve data sheets, piping specifications, and welding inspection records. |
| 8 | Modular LNG terminal equipment integrators | Packaged transfer equipment designed for integration with floating storage or LNG bunkering infrastructure. | Review compatibility with the vessel’s layout, utility limits, operating philosophy, and site-specific hazard studies. | Battery-limit schedule, utility consumption, layout drawings, hazard-study actions, and installation requirements. |
| 9 | Custom skid fabricators working to owner specifications | Build-to-specification frames and assembled packages using owner-approved pump and component selections. | Clarify design responsibility, subcontractor oversight, document control, inspection hold points, and responsibility for package performance. | Responsibility matrix, quality plan, subcontractor list, inspection and test plan, and final manufacturing record book. |
| 10 | Lifecycle service and retrofit package providers | Replacement or upgrade skids, commissioning assistance, maintenance planning, and spare-parts support. | Assess retrofit interfaces, isolation and tie-in planning, maintainability, training, and availability of critical spares. | Site survey, tie-in plan, commissioning scope, recommended spares list, maintenance schedule, and training program. |