| 1 | Channel magnet construction | Permanent magnet or magnets assembled in a steel channel; confirm shape, dimensions, pole arrangement, and mounting method. | Dimensioned drawing, material description, assembly drawing, and representative sample. | Agree dimensional tolerances and inspection method in the purchase specification; there is no single universal channel-magnet specification. | Compare the sample and drawing with the intended installation. |
| 2 | Magnet material options | Ask whether the assembly uses ferrite (ceramic), NdFeB, or another specified permanent-magnet material. | Material grade designation, material data sheet, and lot-specific documentation where available. | For permanent-magnet properties, agree the test method and reporting conditions with the supplier; material grade names alone do not establish finished-assembly performance. | Confirm the material is suitable for the operating temperature and environment. |
| 3 | Magnetic performance | Pull force, holding force, or surface flux density for the complete channel assembly, as applicable to the buyer’s use. | Test report stating the test setup, contact surface, air gap, direction of force, and measurement equipment. | Results depend on geometry, steel thickness, surface condition, and test method; specify these conditions before comparing values. | Request a witnessed or independently checked test using an agreed fixture. |
| 4 | Coating and corrosion protection | Identify the magnet coating, if any, and the finish or corrosion protection of the steel channel. | Coating specification, thickness or finish details where relevant, and test results for the agreed environment. | RoHS and REACH concern regulated substances; they do not by themselves certify corrosion resistance or magnetic performance. | Match the coating and validation test to the actual service environment. |
| 5 | Temperature suitability | Maximum service temperature for the specified magnet material and finished assembly. | Supplier data sheet and written confirmation of performance limits under the stated operating conditions. | Temperature limits depend on material grade, geometry, and operating conditions; do not rely on a generic material-family value. | Check both continuous and peak temperatures, including nearby heat sources. |
| 6 | Manufacturing and customization | Capabilities for cutting or forming the channel, bonding or mechanical retention, hole patterns, and custom dimensions. | Process flow, tooling details, first-article sample, and written change-control procedure. | Define critical-to-quality dimensions and acceptance criteria on the drawing or purchase specification. | Confirm the supplier can reproduce the approved sample at production scale. |
| 7 | Quality management | Documented controls for incoming materials, production inspection, traceability, and nonconforming product. | Current certificate, issuing body, certificate scope, validity dates, and audit or quality records relevant to the product. | ISO 9001 is a quality-management-system standard; certification does not independently certify a particular magnet’s performance. | Verify the certificate’s scope and status with the issuing certification body. |
| 8 | Environmental and automotive requirements | Ability to support environmental management or automotive-sector quality requirements when relevant to the application. | Applicable current certificates and product-specific compliance declarations. | ISO 14001 concerns environmental management systems. IATF 16949 applies to automotive quality management systems within its defined scope. | Check whether the certificate applies to the producing site and relevant business activity. |
| 9 | Regulatory substance documentation | Declarations and supporting information for the exact supplied product, material, and destination market. | Product-specific RoHS declaration and REACH-related information, as applicable; request supporting test reports when required. | RoHS and REACH are separate regulatory frameworks. Applicability depends on product type, market, and current rules. | Confirm the declaration covers the finished assembly and current revision, not only a raw material. |
| 10 | Export readiness and supply continuity | Packaging, labeling, order capacity, lead-time planning, and export documentation for the destination market. | Packaging specification, production schedule, sample shipping documents, and written capacity or lead-time commitments. | Shipping, customs, and product-document requirements vary by destination and shipment; confirm them for each transaction. | Run a sample order and agree inspection, packaging, and delivery terms before scaling up. |