| 1 | Local regulatory requirements | Confirm the rules for importing, installing, registering, and operating an X-ray inspection system in the destination country. Requirements may depend on the equipment type, site, and intended use. | A written compliance checklist referencing the relevant national or regional regulator, plus confirmation from a qualified local radiation-safety professional where appropriate. | Identify required permits, registrations, inspections, and responsible parties before placing the purchase order. A product conformity mark alone may not satisfy local radiation-control requirements. |
| 2 | Radiation protection and safety features | Review the shielding design, interlocks, emergency stops, warning indicators, access controls, and operating procedures. Confirm how radiation levels are measured around accessible areas. | Radiation-safety documentation, equipment drawings, safety-feature test records, and a site radiation survey or acceptance-test plan. | Have accessible-area measurements assessed against the limits and procedures set by the applicable local authority. IAEA guidance can inform good practice, but national rules determine legal limits. |
| 3 | Product conformity documentation | For installations in the European Union, check which applicable product laws cover the equipment, such as EMC Directive 2014/30/EU, Low Voltage Directive 2014/35/EU, or RoHS Directive 2011/65/EU, as relevant to its scope. | Applicable declarations of conformity, the list of standards used, technical documentation, and test reports. Check that documents identify the supplied configuration. | Confirm that the documentation matches the intended market and exact system configuration. CE marking is not a universal approval and does not replace separate local radiation authorizations. |
| 4 | Dual-energy image performance | Evaluate material discrimination, image clarity, penetration, spatial detail, and throughput using representative inspection tasks and test objects. | A witnessed acceptance-test protocol, sample images, stated test-object specifications, and performance results for the proposed operating configuration. | Agree measurable pass/fail criteria before purchase. There is no single universal performance threshold for every application; compare results using the same test method and conditions. |
| 5 | Data, image access, and cybersecurity | Establish what inspection images and operating logs are collected, where they are stored, who can access them, and how software updates and remote support are controlled. | Data-flow description, user-role controls, retention and deletion settings, backup procedures, and the process for approving and recording software updates. | Align retention, access, and security arrangements with the buyer’s policy and applicable privacy or cybersecurity rules in the destination market. |
| 6 | Installation and local service capability | Check site preparation needs, installation responsibilities, commissioning, fault response, spare-parts availability, and the availability of qualified service personnel in the region. | Site-survey checklist, commissioning plan, service-level terms, escalation contacts, spare-parts plan, and details of local service coverage. | Document response and restoration targets, including how support is provided when travel, customs, or local working-hour differences affect service. |
| 7 | Training, testing, and ongoing records | Confirm training for operators and maintenance personnel, routine safety checks, calibration or performance checks, and recordkeeping responsibilities. | Training syllabus and attendance records, operating and maintenance instructions, check schedules, and sample equipment and inspection logs. | Assign owners and intervals for each check, and verify that records can be maintained in the language and format required by local procedures or the regulator. |