| Target depth | Shallow: approximately 30–100 m; intermediate: 100–250 m; deeper: more than 250 m. Local geology can shift these ranges substantially. | Match the rig’s rated drilling depth and hoisting capacity to the planned depth, drill-string weight, casing program, and expected ground conditions. | Review nearby well logs, groundwater records, geological maps, and the required minimum water level or aquifer interval. |
| Ground conditions | Unconsolidated sand and gravel; mixed overburden and rock; or competent formations such as sandstone and granite. | Rotary mud drilling is commonly used in unconsolidated formations; air rotary or down-the-hole hammer methods may suit harder rock. Mixed formations may require more than one method. | Identify anticipated formation changes, cobbles, unstable layers, lost-circulation zones, and any need for temporary casing. |
| Finished borehole diameter | Common water-well casing sizes include about 100–200 mm, but local regulations and pump requirements govern the design. | Select bits, reamers, casing, and drilling tools to achieve the designed borehole diameter and allow for the casing and annular space. | Check the required casing diameter, screen dimensions, pump outside diameter, installation clearance, and applicable construction standards. |
| Required yield | Define a design flow in L/s or m³/h from actual demand. For example, 1 L/s equals 3.6 m³/h. | Yield affects well development, test-pumping equipment, pump sizing, and potentially the number or spacing of wells; drilling equipment alone cannot guarantee yield. | Use aquifer information and a properly conducted pumping test to establish sustainable yield, drawdown, and recovery. |
| Casing and screen program | Set casing and screen intervals from the expected geology and water-bearing zones; dimensions vary by site and design. | Confirm the rig can handle the required casing lengths and installation method. Provide suitable tools for placing casing, screen, and filter pack where specified. | Verify materials, wall thickness, slot size, screen placement, sanitary seals, and local requirements with the well designer. |
| Drilling fluid or air capacity | Fluid circulation and compressor requirements depend on hole diameter, depth, formation, drilling method, and cuttings removal needs. | Size pumps, mud systems, tanks, or compressors to maintain effective circulation or air lift at the planned operating conditions. | Check required flow and pressure, site water availability, fluid handling, discharge controls, and formation sensitivity. |
| Site access and setup | Consider road width, overhead clearance, ground bearing capacity, working area, and distance to water and power. | Choose a rig configuration and support equipment that can reach the site and operate safely within its constraints. | Survey access routes, turning space, setup footprint, noise limits, utility locations, and environmental restrictions. |
| Verification and testing | Plan for well development, water-level measurement, pumping tests, and water-quality sampling after construction. | Allow for development tools, a calibrated flow-measurement method, water-level equipment, and a test pump appropriate to the expected range. | Confirm test duration and reporting requirements with the project engineer or relevant groundwater authority. |
| Selection check | Base the final specification on the site-specific design rather than depth or diameter alone. | Compare rated depth, torque, pullback, mast capacity, available drilling methods, and compatible tooling against the complete well plan. | Ranges are preliminary planning guidance, not a substitute for local hydrogeological assessment, engineering design, or regulatory requirements. |