| Required flow rate | Determine the flow the system needs at its actual operating point, such as litres per minute or cubic metres per hour. | Use the system’s demand rather than choosing a pump by connection size alone. Compare the required flow with the pump performance curve. | Check that expected demand changes will not routinely push the pump outside its recommended operating range. |
| Total head and pressure | Account for elevation difference, required outlet pressure, and friction losses through pipes, valves, and fittings. | Select using the total dynamic head at the required flow. A pump’s maximum head is not necessarily the head available at the target flow. | Review pressure limits for the pump, pipework, seals, and connected equipment. |
| Liquid and materials | Confirm liquid composition, temperature, viscosity, cleanliness, and any corrosive or abrasive properties. | Check the wetted materials and seal materials against the liquid and operating temperature. Do not assume a stainless-steel construction is compatible with every fluid. | Inspect for corrosion, deposits, or seal deterioration; follow the material and fluid supplier’s compatibility guidance. |
| Temperature limits | Compare the normal and maximum liquid temperatures with the pump’s documented limits. | Consider temperature effects on seals, elastomers, clearances, and motor cooling. Use the pump documentation for the specific configuration. | Check for leakage, unusual noise, or changes in performance after temperature changes. |
| Suction conditions | Verify inlet pressure, liquid level, suction-pipe size and length, and the risk of air entry or cavitation. | Keep the suction line adequately sized and as short and direct as practical. Confirm available suction pressure meets the pump’s requirements. | Inspect inlet strainers and suction joints for blockage, leaks, or air ingress. Never run a pump dry unless its documentation explicitly permits it. |
| Electrical supply | Match the motor’s voltage, phase, frequency, rated current, and starting method to the site supply. | Use the motor nameplate and wiring documentation. Provide correctly rated overload and short-circuit protection in accordance with local electrical codes. | Check electrical connections and protective devices during scheduled service, with power isolated before inspection. |
| Pipework and installation | Confirm inlet and outlet connection sizes, orientation, available space, and support for connected pipework. | Ensure the installation does not impose excessive pipe strain on the pump. Provide accessible isolation valves where the system design requires them. | Check for vibration, loose fasteners, pipe leaks, and changes in alignment or mounting condition. |
| Operating pattern | Identify continuous or intermittent duty, start frequency, and expected variation in demand. | Choose a configuration suitable for the duty cycle and control method. Avoid frequent starts beyond the motor’s permitted starting frequency. | Monitor starts, operating temperature, vibration, and any repeated trips or pressure fluctuations. |
| Efficiency and controls | Consider whether flow demand varies and whether the system uses a pressure switch, bypass, or variable-speed control. | Match the control strategy to the system. Variable-speed operation requires compatible motor and drive arrangements and correct configuration. | Verify control settings and protection functions after commissioning and following system changes. |
| Routine maintenance access | Check access to the motor, seals, electrical terminals, and any serviceable components. | Allow enough working clearance for inspection and servicing, and keep the installation documentation available. | Follow the specific pump instructions for inspection intervals, approved replacement parts, and service procedures. |