| 1 | Product dimensions and weight | Measure the smallest and largest product, including its length, width, height, and weight. Note any irregular shapes or fragile areas. | The machine’s loading area, forming equipment, and handling system must accommodate the full range of products. | Product range: 150–400 mm long, 100–300 mm wide, 50–200 mm high; maximum weight: 8 kg. |
| 2 | Package format and protection | Specify the desired package style, such as a film overwrap, shrink-wrapped bundle, stretch-wrapped pallet, or protective paper wrap. | Different formats use different machine configurations and materials. Protection requirements can also affect sealing, tension, and wrapping coverage. | Format: film overwrap; requirements: enclosed package, visible contents, and a sealed bottom fold. |
| 3 | Required production rate | Record average and peak demand in finished packages per minute or hour. Include planned operating hours and expected product changeovers. | A machine’s rated speed may differ from its sustained output once loading, product spacing, stoppages, and changeovers are considered. | Target: 20 packages per minute during a 7-hour production shift, with planned breaks and changeovers accounted for. |
| 4 | Product variety and changeovers | List the number of product sizes, package styles, and material types. Estimate how often operators will switch between jobs. | Frequent changes may make quick adjustments, saved settings, and accessible tooling important to overall productivity. | Product mix: 6 sizes; changeover frequency: approximately 4 times per shift. |
| 5 | Wrapping material | Identify the material type, thickness, roll dimensions, print requirements, and any recycling or packaging specifications that apply. | The wrapping and sealing systems must be compatible with the selected material. Material availability and waste rates also affect operating costs. | Material: recyclable polyethylene film; film thickness and roll width to be confirmed with the machine supplier and material specification. |
| 6 | Plant layout and utilities | Check available floor space, line direction, conveyor height, access for operators, and site requirements for electrical power and compressed air. | A machine must fit the production area and connect safely with upstream and downstream equipment. Utility requirements vary by machine configuration. | Available installation area: 4 m × 3 m; verify conveyor height, power supply, and compressed-air needs before ordering. |
| 7 | Labor, maintenance, and integration | Define staffing, cleaning routines, changeover responsibilities, maintenance access, and the signals or conveyors needed to connect to the production line. | Ease of operation and service access can affect uptime. Integration requirements help prevent bottlenecks between connected machines. | Operating plan: one trained operator; scheduled daily inspection; confirm line-speed and stop/start signal compatibility. |