| Lighting objective | Define whether the priority is road visibility, pedestrian comfort, reduced energy use, improved outage response, or a combination. | The objective determines the lighting design, control strategy, and success measures. | Set measurable targets, such as energy consumption, lighting performance, maintenance response time, or system availability. |
| Road and area classification | Record road type, traffic speed and volume, pedestrian or cyclist activity, conflict areas, and applicable local lighting class. | Lighting criteria vary by road function, user activity, and jurisdiction. | Check the applicable local standard. Common references include EN 13201 in many regions and ANSI/IES RP-8 in North America; use the edition adopted by the authority. |
| Existing lighting conditions | Survey existing poles, luminaires, spacing, mounting heights, electrical circuits, measured light levels, and known dark spots. | Existing infrastructure can affect optical performance, installation cost, and the feasibility of retrofit controls. | Use a site plan and photometric calculations to check illuminance, uniformity, glare, and light trespass before selecting output and optics. |
| Road geometry and surroundings | Measure road width, lanes, curves, intersections, sidewalks, trees, building setbacks, and nearby sensitive locations. | Geometry and obstructions influence pole placement, beam distribution, and unwanted spill light. | Select distribution optics based on the actual layout; assess tree growth and shielding needs where nearby homes or wildlife may be affected. |
| Power availability | Confirm supply voltage, circuit capacity, connection points, earthing, outage history, and electrical inspection requirements. | Power infrastructure determines connection design, installation work, and the suitability of grid-connected or stand-alone systems. | Have a qualified electrical professional verify the supply and protection design. For solar systems, size panels and batteries using local solar data, load, shading, and required autonomy. |
| Climate and environmental exposure | Document temperature extremes, rainfall, dust, humidity, salt air, flooding risk, wind exposure, and potential vandalism. | Environmental conditions affect enclosure selection, materials, corrosion protection, and expected service life. | Specify enclosure and impact protection appropriate to the exposure. Verify stated ingress-protection ratings and operating-temperature limits against the site conditions. |
| Energy and dimming strategy | Estimate operating hours, expected load, tariff structure, and periods when reduced output may be acceptable. | Dimming can reduce energy use, but settings must preserve required visibility and safety. | Define schedules or adaptive rules with minimum output and transition limits based on local requirements and a lighting assessment. |
| Smart-control functions | Decide whether the project needs remote on/off and dimming, fault alerts, energy reporting, asset tracking, or sensor-based control. | Selecting only required functions can simplify commissioning and ongoing operations. | Document required functions, data access, user roles, and failure behavior. Confirm control compatibility with the luminaire and the intended operating platform. |
| Network coverage and cybersecurity | Check cellular or other network coverage, gateway locations, backhaul availability, and the organization's IT security requirements. | Connectivity affects remote management, data reliability, and exposure to security risks. | Test coverage at representative pole locations. Require secure authentication, encrypted communications, controlled access, and a defined software-update process. |
| Maintenance and lifecycle | Identify crew access, pole access method, spare-parts needs, maintenance skills, warranty expectations, and disposal requirements. | Lifecycle costs include installation, energy, inspections, repairs, communications, and eventual replacement. | Compare options using total cost of ownership and require documented maintenance procedures, component availability, and clear warranty terms. |
| Pilot and acceptance criteria | Choose a representative test area that includes typical road geometry, connectivity conditions, and environmental exposure. | A pilot can reveal installation, lighting, communications, and operational issues before wider deployment. | Agree in advance on inspection methods and pass criteria for lighting performance, control response, connectivity, energy reporting, and fault notifications. |