| Compact crawler-mounted rig | Approximately 20–80 kJ, depending on hammer and setup | Small precast concrete piles, sheet piles, and selected steel sections | Restricted urban sites, low-rise construction, small waterfront works, and projects with limited working space | Check access width, ground-bearing pressure, mast reach, pile handling method, and noise restrictions. | Best for access-limited sites |
| Standard crawler-mounted rig | Approximately 60–200 kJ, depending on pile and soil requirements | Precast reinforced-concrete piles, steel H-piles, and sheet piles | General building foundations, industrial facilities, and medium-scale infrastructure on accessible sites | Match hammer energy to pile section, soil resistance, required penetration, and allowable pile stresses. | Versatile general-purpose option |
| Heavy-duty crawler rig | Approximately 150–500+ kJ; final capacity is equipment- and application-specific | Large precast piles, heavy steel piles, and high-capacity foundation piles | Major bridges, ports, energy projects, and large industrial developments | Verify crane or leader capacity, pile cushion requirements, transport limits, platform stability, and environmental controls. | For high-capacity work |
| Leader-guided hydraulic hammer system | Selected to suit the pile design; commonly configured across light to heavy energy classes | Long or slender piles that need controlled alignment during driving | Bridge approaches, wharves, marine structures, and projects where pile verticality is important | Assess leader length, pile pitching method, wind exposure, water access, and required installation tolerance. | Useful for alignment control |
| Excavator-mounted hydraulic pile driver | Varies widely by attachment, carrier size, and pile type; confirm from the attachment’s rated data | Sheet piles and selected short steel piles; capability depends on the carrier and attachment | Temporary works, smaller retaining systems, and sites where an excavator is already available | Confirm carrier hydraulic flow and pressure, attachment compatibility, reach, stability, and permitted duty cycle. | Flexible for selected tasks |
| Low-noise or vibration-controlled piling setup | Chosen to meet the pile design while managing site-specific noise and vibration limits | Sheet piles and selected foundation piles, subject to the approved installation method | Dense urban areas, sensitive buildings, and locations with strict monitoring or work-hour requirements | Consider press-in or pre-boring alternatives where appropriate; monitor vibration and confirm local approvals. | For sensitive surroundings |