| Rapid DFM Feedback | Speed and technical depth of design-for-manufacturing analysis | Initial DFM comments within 1–3 business days, including draft angles, wall thickness, ribs, bosses, parting lines, and gate locations | Redacted DFM reports, sample feedback, and engineering review workflow | 12% |
| Prototype Tooling Lead Time | Time required to complete a suitable low-volume or bridge mold | Approximately 5–15 business days for relatively simple prototype tooling; complex molds may require more time | Written milestone schedule, tool construction plan, and sample approval procedure | 12% |
| Part Production Lead Time | Time from approved samples and materials to finished molded parts | Often approximately 1–4 weeks for standard low-volume orders, depending on quantity, material, finishing, and inspection requirements | Capacity plan, production schedule, and documented on-time delivery history | 12% |
| Material Traceability | Ability to control resin grade, color, additives, and batch information | Material certificates and batch records available for every production order | Resin certificates, safety data sheets, lot numbers, and approved material list | 10% |
| Quality Management | Consistency of molding, inspection, corrective action, and process control | A documented quality system, controlled inspection plans, and formal nonconformance handling | Current quality certificates, inspection procedures, control plans, and corrective-action records | 14% |
| Dimensional Inspection | Accuracy and repeatability of measurements against approved drawings | Inspection reports linked to drawing revision, critical dimensions, tolerances, and sampling plan | First-article inspection report, measurement equipment list, calibration records, and capability data where applicable | 12% |
| Equipment and Process Capability | Machine range, clamping force, shot size, automation, and secondary operations | Equipment matched to part size, resin, tolerance, surface finish, and expected annual volume | Machine list, maintenance records, process parameters, and factory or virtual audit results | 10% |
| Tool Ownership and Maintenance | Ownership terms, mold storage, repair responsibility, and end-of-life arrangements | Contract clearly defines ownership, maintenance, modification approval, storage period, and transfer rights | Tooling agreement, maintenance schedule, spare-parts policy, and mold photographs or records | 8% |
| Quote Transparency | Completeness and comparability of tooling, molding, finishing, packaging, and shipping costs | Itemized quotation with assumptions, validity period, minimum order quantity, payment terms, and revision control | Formal quotation, cost breakdown, inclusions and exclusions, and change-order policy | 8% |
| Communication and Project Control | Responsiveness, English documentation, escalation process, and progress visibility | Named project contact, scheduled status updates, prompt issue escalation, and controlled document revisions | Communication protocol, project tracker, meeting records, and sample update reports | 6% |
| Logistics and Export Readiness | Packaging, shipping options, export documentation, and delivery terms | Clear Incoterms, protective packaging specification, commercial documents, and shipment tracking process | Packing specification, sample export documents, shipping quote, and responsibility matrix | 4% |
| Total Landed Cost | Full project cost rather than mold or unit price alone | Includes tooling, sampling, unit price, finishing, inspection, packaging, freight, duties, taxes, and potential rework | Comparable landed-cost model using identical specifications and delivery assumptions | 10% |