| 1. Define the requirement | Grade, product form, and governing specification | A purchase specification stating the grade, applicable standard and edition, product form, dimensions, delivery condition, and required properties. | Specify whether the requirement is for bar, plate, tube, forging, or another product form. Identify the applicable product standard rather than relying on a grade name alone. | Confirm that the requested standard covers the product form and that all required properties and test conditions are stated. |
| 2. Check grade equivalence | Material designation and chemistry | The proposed grade designation, product-standard reference, and heat-specific chemical analysis. | Treat designations such as SAE/AISI 4140 and 42CrMo4 as related grades, not automatically interchangeable. Review the applicable standards and product requirements before approving substitutions. | Verify that the reported chemistry complies with the specified grade and product standard; obtain written approval for any substitution. |
| 3. Qualify the supplier | Legal identity and production capability | Legal business details, manufacturing or processing scope, quality-system documentation, and a clear identification of any subcontracted processes. | Check that the contracting entity, invoice issuer, and receiving bank details are consistent and independently verified. Establish whether the seller is a mill, stockholder, or processor. | Confirm that the supplier can document the actual source and scope of work; independently validate payment-detail changes. |
| 4. Review quality controls | Inspection, testing, and traceability | Inspection and test plan, sample test reports, heat/lot traceability procedure, and details of any independent inspection requested. | Agree on tests, sampling, inspection access, acceptance criteria, and reporting before production or shipment. Match each test to the purchase specification. | Ensure the test method, sample location, frequency, and acceptance limits are defined by the applicable specification or purchase agreement. |
| 5. Verify material documents | Inspection certificate and heat identification | A material test certificate with grade, heat number, chemical analysis, mechanical test results where required, product condition, and applicable specification. EN 10204 Type 3.1 may be specified where appropriate. | Check the certificate against the order and, where available, validate it with the issuing organization. Link certificate numbers and heat numbers to the delivered bundle or piece. | Confirm that certificate data match the ordered grade, required tests, delivery condition, and physical markings. A certificate type alone does not establish compliance. |
| 6. Confirm processing and condition | Heat treatment and mechanical properties | Specified delivery condition, heat-treatment records when required, and test results for the agreed mechanical properties. | State whether the material is supplied as-rolled, normalized, annealed, quenched and tempered, or in another specified condition. Set property requirements for the relevant product size and test location. | Do not apply generic strength values across all sizes and conditions; check results against the exact grade, product standard, and ordered condition. |
| 7. Approve the commercial offer | Price, quantity, and delivery terms | A quotation stating unit and total price, currency, quantity and tolerance, production lead time, validity, packaging, and the named delivery place under the selected Incoterms® 2020 rule. | Compare offers on the same specification and delivery basis. Clarify who arranges carriage, insurance, export clearance, and import formalities under the agreed rule. | Ensure the exact named place and rule are stated; Incoterms® allocate defined delivery obligations, costs, and risks but do not replace the sales contract. |
| 8. Plan international compliance | Customs, origin, and import requirements | Commercial invoice, packing list, transport document, certificate of origin when required, and product-specific documents required by the destination market. | Have the importer or customs broker confirm the tariff classification, duty treatment, origin rules, and any trade measures or permits before shipment. | Do not assume one HS code or duty rate applies worldwide; classification and import requirements depend on product details and destination jurisdiction. |
| 9. Inspect before dispatch | Quantity, dimensions, condition, and marking | Inspection records, packing photographs, dimensional checks, quantity confirmation, and a packing list linked to heat or lot identifiers. | Arrange the agreed pre-shipment inspection and document any nonconformity, corrective action, or approved concession before release. | Check packaging suitability for the transport route and verify that markings remain legible and traceable after packing. |
| 10. Receive and close out | Receipt inspection and claims process | Delivery records, receipt inspection results, preserved certificates, and the contract’s notification and claims procedure. | Inspect received goods promptly, retain packaging and traceability records, and notify the supplier of shortages or nonconformities within the agreed time. | Follow the purchase contract and applicable law for notice periods, remedies, and dispute resolution. |